Click on a photo to enlarge.
The Before picture shows the damaged concrete the needs to be replaced.
The During picture shows how we removed the concrete and prepared the area for new concrete with rebar.
The After picture shows the end result of our finished concrete.
The Before Picture is a Push Pier being attached.
The After Picture is the area when we finished.
The Before picture shows the Crawlspace of a home with tilting floors.
The After picture shows all metal Smart Jacks added to level the floor.
The Befors picture shows a sagging floor.
The After picture shows a installed Smart Jack that is stabilizing this floor.
2 photos of before and after hydraulic pier installation alongside a commercial building in Brea, CA.