Click on a photo to enlarge.
The before photo shows a school in Norco that had an issue with settled slabs of concrete caused by voids. As shown in the after photo, to correct this problem we injected our PolyLevel solution under the concrete to lift and stabilize the slabs. When the concrete is lifted to the correct level we will fill the joints with the state-of-the-art sealant NexusPro which will give the best possible finish and protect the joints from the elements.
The Before Picture shows the installation of a Push Pier to a Cracked Foundation.
The After Picture shows the Same Pier that has been Pressurized. It has Lifted this sinking section of the Foundation.
Whittier, Ca. Steel beam and SmartJack Support System in crawl space