Click on a photo to enlarge.
This additional photo set from the same Vista, CA project highlights another section of the foundation wall that required structural reinforcement. The wall showed clear signs of cracking and surface deterioration, often caused by prolonged soil pressure and shifting conditions common in the San Diego area.
Our team stabilized the affected section using high-strength reinforcement straps anchored directly to the foundation wall. These straps are designed to prevent further cracking, distribute structural loads, and restore long-term stability without the need for invasive excavation.
By addressing multiple sections of the wall, this repair ensures the entire foundation system is reinforced—helping protect the home from future structural movement and damage.
Crack Closing
The Before Picture shows a crack that has formed in a Concrete Slab at a construction site.
The After Picture shows the same area after the PolyLevel Injection Process.
The before photo shows the home that's in need of our helical piers.
The during photo shows the process of us digging the holes to install helical piers.
The after photo shows the helical pier all installed.
The Before Picture shows the Crack, that has formed Between the Chimney and the Home. There is a Void under the Chimney, causing it to lean away from the Home.
The After Picture shows installed Push Piers, Lifting the Chimney back to a Consistent Elevation.